Unit for lifting house construction elements on the construction site The house construction elements are lifted from the truck and placed on the foundations.
As the elements come in different sizes the lifting frame needs to be adjustable. It is provided with hydraulically adjustable length and width settings. Also, it can compensate or create angled positions in 2 directions. The lifting frame has its own power supply and it is radio controlled. All it requires for operation is a construction crane.